RESTRICTED
UNSC5PORT397384096SGC-UK

28 OCT 18
Articles
CONTACT!
RGHQ-51
Military Ref. Page
UNITED NATIONS STAR GATE COMMAND LOGO          
               Alien
     Biological
     Contaminant
     Data Set
    
     FLAG OF THE UNITED KINGDOM

ABC Introduction ABC Data ABC Bar Chart

The following chart contains all the recorded readings, plus the geological evidence taken both before and during the CONTACT programme. It is set out chronologically and includes the two off-world training operations CON-01 (14 JUL 96) and CON-02, plus the first real mission CON-03 Op. HASTINGS later the same year (1996). Between then and CON-52 Op. BANNOCKBURN (04-06MAR05), there was no change in the ambient atmospheric readings, and so no data has been included. However thereafter it began to rise considerably. Note also that entries are only included for Flight Operations, all Support Operations being omitted as no missions were conducted, and therefore no data was collected.

See the Introduction for a basic guide to the subject and the Bar Chart for a simplified visual aid to the following data.

Legend

1u unit of airborne ABC = approximately 1 part per trillion by volume, that is equal to 1ml in 1 million m3 of atmospheric air. NB: comparitive contamination of plants and animals is much higher, and is usually expressed as a definite value, that is in "ml" (millilitres), aka "cc" (cubic centimetres). NB: the density or Specific Gravity of the ABC is equal to that of pure water (1g/ml).

  • Left Hand Column: the operation's "CON" number.
  • Upper Row, Column 1: the operation's code name.
  • Upper Row, Column 2: the operations dates
  • Upper Row, Column 3: the number of days between the end dates of this and the previous off-world operation.
  • Upper Row, Column 4: the total rise or fall of M1 ABC since the previous off-world operation.
  • Upper Row, Column 5: the total M1 ABC and its percentage, at the end date specified.
  • Upper Row, Column 6: the M1 rate of change in Units per day.
  • Upper Row, Column 7: the total rise or fall of M2 ABC since the previous off-world operation.
  • Upper Row, Column 8: the total M2 ABC and its percentage, at the end date specified.
  • Upper Row, Column 9: the M2 rate of change in Units per day.
  • Upper Row, Column 10: the percentage increase of the aggregate ABC over the previous off-world operation, and the resulting total in ABC units.
  • Lower Row, a bar chart as a visual aid to understanding the above data.

CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
N/A Hadean ~ Early Eoarchean 4,600 ~ 3,800
million years ago
N/A ? ? ? ? ? ? ?
From the formation of the various "Earths" through to the end of the Late Heavy Bombardment
No evidence of M1 ABC in the fossile record to date 
 No evidence of M2 ABC in the fossile record to date
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
N/A Mid ~ Late Eoarchean ~ Paleoarchean 3,800 ~ 3,200
million years ago
N/A Variable Variable Variable Nil Nil Nil Variable
From the end of the Late Heavy Bombardment to the end of the Paleoarchean, an era in which simple life first appears in the fossile record
Note that the M1 ABC appear earlier in the fossile record of planets closer to the Spline Root, all of which are currently established upon P567.
Variable M1 ABC 
 No evidence of M2 ABC in the fossile record to date
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
N/A Pre-Cambrian Era 3,200 ~ 542
million years ago
N/A Trace Trace Trace Nil Nil Nil Trace
Post establishment of life to the Snowball Earth event (c.650 ~ 542 mya)
Trace M1 ABC
No evidence of M2 ABC in the fossile record to date
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
N/A Cambrian~Holocene Era 542mya~1934 N/A Trace Trace Trace Trace Trace Trace Trace
From the second Snowball Earth to 1934: Trace M1 ABC
Trace M2 ABC
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
N/A Byrd's Solo Expedition 28MAR-12OCT34 N/A Trace Trace Trace Trace Trace Trace Trace
BYRD EXPEDITION: M1 Trace
M2 Trace
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
N/A Op. HIGH JUMP 26AUG46-28FEB47 12 years +100u 100u 99.6% ?u +0.34u 0.34u 0.4% ?u +c.100.333u(+c.99.999%)=100.34u
OPERATION HIGH JUMP 100u = 99.6% M1
M2 0.34u = 0.4%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
01 BP#1 14JUL96 N/A 0u 100u 99.6% 0u 0u 0.34u 0.4% 0u 0u (0%) = 100.34u
100u = 99.6% CON-01 M1
M2 0.34u = 0.4%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
02 BP#2 01SEP96 47 0u 100u 99.6% 0u 0u 0.34u 0.4% 0u 0u (0%) = 100.34u
100u = 99.6% CON-02 M1
M2 0.34u = 0.4%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
03 Op. HASTINGS 26-27OCT96 55 0u 100u 99.6% 0u 0u 0.34u 0.4% 0u 0u (0%) = 100.34u
100u = 99.6% CON-03 M1
M2 0.34u = 0.4%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
52 Op. BANNOCKBURN 04-06MAR05 106 0u 100u 99.6% 0u 0u 0.34u 0.4% 0u 0u (0%) = 100.34u
100u = 99.6% CON-52 M1
M2 0.34u = 0.4%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
53 Op. BADEN HILL 20-22MAY05 75 +17u 117u 99.7% +0.226u 0u 0.34u 0.3% 0u +17u (+16.9%) = 117.34u
117u = 99.7% CON-53 M1
M2 0.34u = 0.3%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
55 Op. EDINGTON 07-09OCT05 140 +18u 135u 99.75% +0.128u 0u 0.34u 0.25% 0u +18u (+15.3%) = 135.34u
135u = 99.75% CON-55 M1
M2 0.34u = 0.25%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
56 Op. STALLING DOWN 25-27NOV05 49 +17u 152u 99.77% +0.346u +0u 0.34u 0.23% +0u +17u (+12.6%) = 152.34u
152u = 99.77% CON-56 M1
M2 0.34u = 0.23%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
58 Op. DUNBAR/EIC#11 24-26MAR06 120 +11u 163u 99.79% +0.091u +0u 0.34u 0.21% +0u +11 (+7.2%) = 163.34u
163u = 99.79% CON-58 M1
M2 0.34u = 0.21%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
60 Op. NEVILLES CROSS 04-06AUG06 64 +16u 179u 99.81% +0.25u +0u 0.34u 0.19% +0u +16u (+9.8%) = 179.34u
179u = 99.81% CON-60 M1
M2 0.34u = 0.19%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
61 Op. HEDGLEY MOOR 29SEP-01OCT06 56 +12u 191u 99.82% +0.21u +0u 0.34u 0.18% +0u +12u (+6.7%) = 192.34u
191u = 99.82% CON-61 M1
M2 0.34u = 0.18%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
62 Op. SOLWAY MOSS 17-19NOV06 50 +17u 208u 99.83% +0.34u +0u 0.34u 0.17% +0u +17u (+8.9%) = 208.34u
208u = 99.83% CON-62 M1
M2 0.34u = 0.17%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
65 Op. HATFIELD CHASE 15-17JUN07 210 +89u 297u 99.88% +0.423u +0u 0.34u 0.12% +0u +89u (+42.7%) = 297.34u
297u = 99.88% CON-65 M1
M2 0.34u = 0.12%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
66 Op. ELLANDUN 03-05AUG07 56 +11u 308u 99.77% +0.196u +0.34u 0.68u 0.23% +0.006u +11.34u (+3.8%) = 308.68u
308u = 99.77% CON-66 M1
M2 0.68u = 0.23%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
67 Op. HIXTON DOWN 28-30SEP07 54 +8u 316u 99.68% -0.148u +0.32u 1u 0.32% +0.006u +8.32u (+2.7%) = 317u
316u = 45% CON-67 M1
M2 1.0u = 0.23%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
68 Op. WINCHESTER 16-18NOV07 49 +4u 320u 99.07% +0.081u +2u 3u 0.93% +0.0.40u +6u (+1.9%) = 323u
320u = 99.07% CON-68 M1
M2 3u = 0.93%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
72 Op. LOSECOAT FIELD 01-03AUG08 255 +2u 322u 95.83% +0.007u +11u 14u 4.17% +0.043u +13u (+4%) = 336u
322u = 95.83% CON-72 M1
M2 14u = 4.17%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
73 Op. GATE FULFORD 26-28SEP08 54 +1u 323u 93.62% +0.018u +8u 22u 6.38% +0.148u +9u (+2.7%) = 345u
323u = 93.68% CON-73 M1
M2 22u = 6.38%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
74 Op. ANCRUM 14-16NOV08 47 +10u 333u 90% +0.212u +15u 37u 10% +0.319u +25u (+7.24%) = 370u
333u = 90% CON-74 M1
M2 37u = 10%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
77 Op. GREAT YARMOUTH 26-27SEP09 318 +44u 377u 89.12% -0.138u +9u 46u 10.88% +0.028u +53u (+14.32%) = 423u
377u = 89.12% CON-77 M1
M2 46u = 10.88%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
83 Op. SLAPTON SANDS 27-28NOV10 426 -22u 355u 79.77% -0.051u +44u 90u 20.23% +0.721u +22u (+5.2%) = 445u
355u = 79.77% CON-83 M1
M2 90u = 20.23%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
84 Op. YORK 26-27NOV11 364 -20u 335u 67.54% -0.054u +71u 161u 32.46% +0.195u +51u (+11.46%) = 496u
335u = 67.54% CON-84 M1
M2 161u = 32.46%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
86 Op. "X" 24-25NOV12 362 -22u 313u 55.21% -0.060u +93u 254u 44.79% +0.256u +71u (+14.31%) = 567u
313u = 55.21% CON-86 M1
M2 254u = 44.79%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
88 Op. STIRLING BRIDGE 03-04AUG13 247 -15u 298u 45.08% -0.061u +109u 363u 54.92% +0.818u +94 (+16.57%) = 661u
298u = 45.08% CON-88 M1
M2 363u = 54.92%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
89 Op. VERULAMIUM 30NOV-01DEC13 118 -18u 280u 36.84% -0.153u +117u 480u 63.16% +0.992u +99u (+14.97%) = 760u
280u = 36.84% CON-89 M1
M2 480u = 63.16%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
90 Op. ROUNDWAY DOWN 22-23MAR14 111 +252u 532u 50.62% +2.270u +39u 519u 49.38% +0.351u +291u (+37.3%) = 1,051u
532u = 50.62% CON-90 M1
M2 519u = 49.38%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
92 Op. OTTERBURN 07-08FEB15 321 +34u 566u 51.5% +0.09657u +14u 533u 48.5% +0.0436u +48u (+4.567%) = 1,099u
566u = 51.5% CON-92 M1
M2 533u = 48.5%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
93 Op. BEAUMARIS 06-07JUN15 118 +15u 581u 56.2% +0.12712u -81u 452u 43.8% -0.6864u -66u (-6.005%) = 1,033u
581u = 56.8% CON-93 M1
M2 452u = 43.8%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
95 Op. CHESTER 19-20MAR16 293 +10u 591u 70.19% +0.017u -201u 251u 29.81% -0.686u -191u (-18.49%) = 842u
591u = 70.81% CON-95 M1
M2 251u = 29.19%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
96 Op. LEWES 18-19JUN16 90 +5u 596u 80.432% +0.0556u -106u 145u 19.568% -1.1778u -101u (-11.995%) = 741u
596u = 80.432% CON-96 M1
M2 145u = 19.568%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
97 Op. SHREWSBURY 24-25SEP16 97 +1u 597u 81.557% +0.01031u -10u 135u 18.443% -0.10309u -9u (-1.2295%) = 732u
597u = 81.557% CON-97 M1 
  M2 135u = 18.443%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
98 Op.ANGLESEY 05-06NOV16 41 +1u 598u 82.143% +0.0244u -5u 130u 17.857% -0.1220u -4u (-0.5495%) = 728u
598u = 82.143% CON-98 M1 
  M2 130u = 17.857%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
101 Op.ASHDOWN 09-10DEC17 400 -60u 538u 82.643% -0.150u -17u 113u 17.357% -0.0.0425u -77u (-0.5495%) = 651u
538u = 82.64% CON-101 M1 
  M2 113u = 17.360%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
103 Op.BENFLEET 31MAR-02APR18 83 -10u 528u 84.210% -0.12048u -14u 99u 15.789% -0.16867u -24u (-0.36866%) = 627u
528u = 84.210% CON-103 M1 
  M2 99u = 15.789%
CON# Operational Code Name Date(s) ~Days~ M1 +/-u Total M1 u/% M1 +/-u Per Day M2 +/-u Total M2 u/% +/-u M2 Per Day Total ABC
106 Op.STOW 29-30SEP18 181 -71u 457u 90.76621% -0.392265u -52u 47 9.23379% -0.28729u -118u (-18.819%) = 509u
457u = 90.76621% CON-106 M1 
  M2 47u = 9.23379%

END OF DOCUMENT

Top
RESTRICTED